Home Uncategorized Ministry of Rural Transformation completes repairs at Independence water system

Ministry of Rural Transformation completes repairs at Independence water system

61

By Zoila Palma:  On February 2, 2026, the Ministry of Rural Transformation’s Rig Crew was on-site in Independence, taking swift action to restore the local water supply.

Following a system failure, the team airlifted the production well and installed a brand-new submersible pump and motor.

“Our team remained dedicated to getting the system back online as quickly as possible and appreciate the community’s patience while these repairs were finalized,” the Ministry said.

The post Ministry of Rural Transformation completes repairs at Independence water system appeared first on Belize News and Opinion on www.breakingbelizenews.com.

By Zoila Palma:  On February 2, 2026, the Ministry of Rural Transformation’s Rig Crew was on-site in Independence, taking swift action to restore the local water supply. Following a system failure, the team airlifted the production well and installed a brand-new submersible pump and motor. “Our team remained dedicated to getting the system back online
The post Ministry of Rural Transformation completes repairs at Independence water system appeared first on Belize News and Opinion on www.breakingbelizenews.com.