Home Uncategorized Belize approves submarine fibre optic cable through its waters

Belize approves submarine fibre optic cable through its waters

86

By Breaking Belize News Staff (HP): The Department of the Environment (DOE) has approved the passage of the TAM-1 submarine fibre optic cable through Belize’s territorial waters, on the condition that environmental safeguards are met.

The project, developed by Trans Americas Fiber Systems, will connect Mexico, Guatemala and Honduras. It is part of a larger 7,200 kilometre cable system linking the United States, Mexico, Central America and the Caribbean.

Belmopan Aggregates

The approved route crosses Belizean waters in two places: a deep water corridor east of Lighthouse Reef Atoll and a 33 kilometre stretch through Conservation Zone Four of the Sapodilla Cayes Marine Reserve in the south.

The decision follows an environmental impact assessment and public consultation, including a public meeting held on October 15. The National Environmental Appraisal Committee concluded the project could go ahead with safeguards in place.

Before any construction begins, the operator must sign an Environmental Compliance Plan with the DOE.

The assessment identified possible risks to coral, seagrass and the seabed, as well as accidental fuel spills.

The post Belize approves submarine fibre optic cable through its waters appeared first on Belize News and Opinion on www.breakingbelizenews.com.

By Breaking Belize News Staff (HP): The Department of the Environment (DOE) has approved the passage of the TAM-1 submarine fibre optic cable through Belize’s territorial waters, on the condition that environmental safeguards are met. The project, developed by Trans Americas Fiber Systems, will connect Mexico, Guatemala and Honduras. It is part of a larger
The post Belize approves submarine fibre optic cable through its waters appeared first on Belize News and Opinion on www.breakingbelizenews.com.